Show Me the Money: Who is Responsible for the Impacts of a Differing Site Condition on a Design-Bid-Build Project Versus a Design-Build Project? Presented by Nick Zaita and Rudy Frizzi of Langan Engineering on May 12, 2022.

The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.